Shop and Flat Development
Victoria Road, Netley
Situated in Netley this building was dilapidated and unused. MS Projects under took a complex planning application to extend the building to provide two large flats and two new shops. Most of the building was replaced with the front de constructed by hand and rebuilt in order to reclaim the original bricks. Due to the buildings location in a design and conservation area the roof was replaced with new slate and the windows with traditional box sash’s.




Flat conversion
Bishops Road, Woolston
Our client wanted to convert a dilapidated house into several flats. MS Projects took control of the design, planning application and subsequent build. The site produced four well designed flats with amenities space.Breathing life back into this property improved the general appearance of the neighbourhood and was well received.

Shop Alterations
Bracklesham, Chichester
Our client wanted to increase their retail space whilst providing an area to bring the inside out. This custom decking provided an excellent way to present this space.

