Architectural homes, built for the next generation.
New builds, extensions, conversions and renovations across Hampshire and the surrounding counties - delivered by one in-house team from foundations to completion, with low-energy, renewable-ready design as standard.

MS Projects is setting new standards of construction within Hampshire and the surrounding counties. We specialise in all types of building projects including new builds, extensions, refurbishment, loft conversions, kitchens, bathrooms and heating systems.
Founded in 2004 by Matt Fitch and Sean O'Connor, MS Projects was set up to raise the standard of construction. Our specialist team of multi-skilled technicians works on your project from foundations to completion, so it is never held up waiting for trades and disruption is kept to a minimum.
We understand every element of the construction process and the latest innovations - home automation, bifold door systems, glass walls, oak framed buildings and computer-controlled heating with weather compensation.
More about usEvery type of building project, under one roof.
From a single room to a complete new home, we design, plan and build with the same in-house team - and a fixed price agreed up front.
Loft conversions
Dormers, roof lights and full loft rooms that add space without losing garden.
Garage conversions
Turn under-used garages into insulated, liveable rooms.
New builds
Modern, open-plan homes from planning through to handover.
Structural alterations
Steels, knock-throughs and open-plan remodelling done safely.
Extensions
Single and double storey, vaulted and glazed extensions.
Kitchens
Design, supply and fit - including services and finishes.
Bathrooms
Bathrooms, en-suites and cloakrooms finished to a high standard.
Refurbishments
Whole-house renovations that bring tired properties up to date.

Low-energy building and renewables, designed in from day one.
The greenest energy is the energy a building never needs. We combine a fabric-first approach with modern renewable systems, so new homes and extensions are comfortable, efficient and cheaper to run.
Solar PV & battery storage
Roof-integrated or on-roof panels sized to your usage, with battery storage to use more of what you generate.
Air source heat pumps
Low-carbon heating paired with underfloor heating and correctly sized radiators.
Fabric-first insulation
High-performance insulation and airtight detailing that cuts heat loss before any technology is added.
Smart heating controls
Computer-controlled heating with weather compensation and home automation.
High-performance glazing
Bifold systems, glass walls and composite doors with excellent thermal values.
EV charging
Home charge points wired in during the build, ready for today's and tomorrow's cars.
Recent work across Hampshire.
New spaces that add to the quality of living - whether by extending, converting or renovating.
A major extension and refurbishment of a large period house. A single-storey wraparound extension with a flat roof…
A full rebuild and remodel of a bungalow in Winchester, creating a contemporary family home over several levels.…
A whole-house project in Winchester: a dormer loft conversion, a new single-storey rear extension and a full internal…
The development of a three-bedroom house into a luxury five-bedroom home, with one bathroom, two en-suites and open-plan…
A derelict, flood-damaged bungalow in West End, transformed and extended into an eco home. The house was stripped…
Converting a bungalow in West End into a two-storey home. The original roof was removed and a new…
From first sketch to final sign-off.
Design & planning
We turn your initial ideas into drawings and guide you through the planning application.
Fixed-price quote
An accurate, fixed price so you have financial peace of mind from the start.
One in-house team
The same multi-skilled staff from foundations to completion - no waiting for trades.
Handover & warranty
Building control sign-off, certificates and an insurance-backed warranty.
Approved, inspected and insured.
Independent checks on our work, trading record and finances - so you can choose us with peace of mind.
Federation of Master Builders
FMB members pass credit, public record and director checks, sign a strict Code of Practice and agree to independent dispute resolution through the RICS. All members can offer Build Assure warranties.
Verify our membership →
TrustMark
Government-endorsed: regular on-site inspections, a code of practice covering insurance, health & safety and customer care, insurance-backed warranties and deposit protection.
TrustMark customer charter →Planning a new build, extension or energy upgrade?
Tell us about your project and we will arrange a site visit.
